Skip to content
Prestag
A modern high rise under construction with a tower crane and safety netting
Construction and contracts

Payment waits where the two entries disagree.

The contractor says the slab is done. The engineer says it is four fifths done. Both enter their own figure, neither sees the other, and the bill stops on the row where they differ.

Dual entrySite attendanceStage progressPlant hoursTool issue
01  /  Two entries, one sheet

Nobody has to be wrong for this to be useful.

Most disagreements on a site are honest ones. A quantity measured on a different day, from a different corner, by a different tape. Writing both down and dating them turns a month of argument into one row that needs settling.

PKG 04 · BLOCK A · RUNNING BILL 61 HELD
StageContractor enteredEngineer enteredStatus
Excavation1,240 cum04 Mar 11:201,240 cum04 Mar 16:02Matched
Footing, PCC86 cum09 Mar 10:0586 cum09 Mar 17:41Matched
Columns, level 124 nos15 Mar 09:4824 nos15 Mar 18:13Matched
Slab 1, block A312 sqm22 Mar 12:31268 sqm22 Mar 17:55Held
Plaster, block A1,910 sqm29 Mar 11:02Not enteredWaiting

The bill moves on the matched figure. The held row keeps both numbers and the time each was entered, so the difference is a conversation with a date on it rather than an argument.

02  /  Who was on site

Thirty five booked. Twenty nine walked in.

Read at the gate as they arrive, trade by trade. The gap shows up at half past seven in the morning, while it can still be fixed, instead of on a muster typed up on Friday afternoon when it is only a number to be explained.

Mason8 of 8
Bar bender5 of 6
Carpenter4 of 4
Helper9 of 12
Operator3 of 3
Electrician0 of 2
First in 06:58 · gate B · Tuesday29 of 35 on site
03  /  Questions it answers

What the site meeting stops being about.

01

Is the stage actually done?

The contractor and the engineer enter the same stage separately, without seeing each other. The bill moves on what both recorded and stops where the two differ.

02

Who was on site, and for how long?

Read at the gate as people arrive, per trade, rather than a muster written up on Friday for the whole week.

03

Where is the excavator today?

Plant and tools on the map, with hours run per machine. Idle hire is easier to argue about when the machine kept its own record.

04

Why is this bill held?

Because two people entered different numbers on the twenty second. Both numbers are on the row, with the time each was entered.

05

Which of my sites is behind?

Stage progress across every site on one scale, so the site that needs a visit is obvious from the office.

04  /  What gets recorded

A record that was made on the day.

Everything here is captured where the work happened, by the person who saw it, at the time they saw it. That is the only version of a site record anybody trusts six months later.

STAGE

Quantity and date, entered twice and independently.

MATCH

Matched, held or waiting. A held row keeps both figures and both timestamps.

ATTENDANCE

Read at the gate, by trade, with first in and last out.

PLANT

Position and hours run for every machine on hire.

TOOLS

Issued, returned, or still with someone who left at four.

PHOTOS

Tied to the stage and the day rather than sitting in a gallery on one phone.

05  /  What it reads

Runs on whatever is already fitted.

A card or a face at the gate, a tag on the machines worth tagging, a phone in an engineer's pocket for the entries. Sites are rough on hardware, so the less of it the better.

ID cardFixed readerHandheldGPS unitPhone entry
Contact

Try it on one package.

One package, one running bill, both sides entering. If the held rows are not worth the trouble, you have lost a month and learned something.

hello@prestag.com